Thailand

Turnkey padel court construction in Thailand

Based on Koh Samui, our Thai team handles projects across Thailand, from the southern islands to the far north: hotels, resorts, private courts and full-scale padel clubs.

0Projects in Thailand
0Courts installed
8-12Weeks to first serve
1Contract, one team

Turnkey meanswe carry the build

From a plot of land to a fully operational club, under one contract and with one point of contact. We handle the permits, the design, the engineering, the build and the courts, so you never coordinate a single contractor yourself.

Court supply, foundation and light roof: 3 to 6 months from signed agreement to first serve. Full builds with larger roof, clubhouse and amenities: 6 to 12 months.

01

Site and feasibility

Survey, ground conditions, access, orientation and how many courts the land will take.

02

Design and permits

Layout, specification, documentation and the local approvals your project needs.

03

Groundworks and supply

Foundations poured to court tolerance, courts manufactured, shipped and cleared through customs.

04

Installation and aftercare

Structure, glass, turf, lighting and fencing by our own crew, then training and maintenance.

Process

How a Thailand buildruns

Start yours
01

Design & Architecture

Architects shape the club around your land and vision: courts, clubhouse, parking and amenities. Every drawing is produced by our team and licensed Thai professionals.

Architect · Club design · Site layout
02

Permits & Approvals

We prepare and file the building permit with the local Tessaban and manage it through to approval with our Thai partners, so there is no bureaucracy on your side.

Tessaban · Building permits · Compliance
03

Engineering

Licensed Thai engineers design every layer: soil-appropriate footings, ground beams, reinforced slabs sized to court loads, wind-rated steel roof structures, drainage and lighting circuits.

Structural · Electrical · Drainage
04

Construction

Our construction partners take the site from bare land through footings and slab to steel roof and clubhouse. A full turnkey build, managed end to end.

Groundwork · Slab · Roof · Clubhouse
05

Installation

Specialist crews handle each stage: glass, structure, turf and lighting, assembled to the same standard as our global builds, then handed over as a fully operational club.

Courts · Glass & turf · Lighting

Prism Padel

Prism Padel

01

Site and feasibility

Survey, ground conditions, access, orientation and how many courts the land will take.

02

Design and permits

Layout, specification, documentation and the local approvals your project needs.

03

Groundworks and supply

Foundations poured to court tolerance, courts manufactured, shipped and cleared through customs.

04

Installation and aftercare

Structure, glass, turf, lighting and fencing by our own crew, then training and maintenance.

FAQ

Questions we getabout Thailand

What is the maximum roof height required for a padel court?

There is no maximum. Roof structures rise in price exponentially the higher they go, because foundations and footings must be dug deeper and made wider. In our opinion anything over 12 metres is redundant for padel.

What is the minimum roof height required at the lowest point?

FIP regulations require a minimum of 6 metres of completely obstacle-free height above the court, with 8 metres recommended for new builds. In practice we consider anything below 8 metres too low for a quality playing experience. The ideal balance of playability and cost is an apex at 10 metres with the sides at 8 to 9 metres.

What roof height do you recommend for professional-level indoor courts?

Nine metres and up, though anything over 12 metres is redundant. Roofs at 7 to 8 metres at the apex will affect lob play; 10 metres will not. A 10 metre apex suits all levels, from beginners to professionals, and is the most cost-efficient approach.

What clearance is needed above the playing area including lighting?

The FIP minimum is 6 metres completely free of obstacles, including light fixtures, with 8 metres recommended for new construction. We recommend 10 metres for cost efficiency and a height that never affects play.

Do you provide roof design drawings?

Yes. Roof design drawings showing the apex and eave levels for your specific project are prepared for every build and provided together with the quotation.

Canvas or metal sheet for the roof?

Always metal. Canvas and awnings can break, are prone to tearing and discolour over time. Really high quality canvas requires a different structure and grade of awning, which ends up more expensive than a metal roof.

What are the exact court dimensions including the safety runoff?

A padel court is 200 sq.m of playing area (20 x 10 m). With the columns outside the playing area the structure adds another 14 cm of width. International standards require 2 metres of circumventing space for professional tournaments. Placing courts long-side by long-side with 1 metre around each gives every court 2 metres of combined space, satisfying the FIP runoff regulations.

What total space is required for 1 court and for 4 courts?

1 court: 200 sqm + 60 sqm runoff = 260 sq.m. 2 courts: 400 + 120 = 520 sq.m. 3 courts: 600 + 180 = 780 sq.m. 4 courts: 800 + 240 = 1,040 sq.m. The 60 sqm of runoff per court assumes courts placed long-side by long-side sharing runoff space.

What flooring surface do you recommend indoors versus outdoors?

There is no difference in flooring surface. A concrete base is the foundation either way, with 12 mm artificial monofilament turf as the playing surface. Outdoors we use turf with drainage holes in the backing for quicker drainage after rain.

What are the foundation and concrete requirements, and is the slab included?

15 cm thickness, 240 KSC concrete. With a turnkey solution the footings, concrete slab, roof and Tessaban permit application costs are all accounted for in the quotation.

What is the installation timeline per court?

We have two teams. The structure team builds the glass and metal and unloads the container on arrival, including our rental of a crane with 4,000 kg lift capacity. Court structure set-up takes about 3 days per court. The turf team then places, cuts, glues and sands the turf, which takes 1 day per court.

How many technicians are on site during installation?

Structure team: 4 to 6 people. Turf team: 4 to 5 people.

Do you provide full installation service in Thailand?

Yes. Our court prices are packages where everything is handled from our end, including unloading from container to site, which the industry standard usually leaves to the client. All silica sand needed (2,000 kg per court) plus back-up sand is included and delivered before turf installation.

What maintenance keeps a court in top condition?

Basic glass panel cleaning, brushing of the courts and monthly check-ups on the glass screws. We provide a maintenance schedule for your staff to follow.

What is the estimated annual maintenance cost?

Maintenance is done by staff already on salary, so it is not an extra cost. Sand and extra sand are included in the court package. In year two you may need more silica sand, which we sell at 7,900 THB per tonne.

What lux level do you recommend for padel courts?

Around 300 lux is more than enough for a club and recreational courts. With 200 W dedicated padel LED fixtures at 6 to 8 m height the light disperses evenly. Our lighting has been used for numerous FIP and APPT international tournaments, on covered and outdoor courts, with zero complaints to date.

Which LED lights do you recommend?

We include high quality, well tested 200 W LEDs for all our courts: cost efficient and reliable. The ideal aim is a small tilt of no more than 10 to 15 degrees toward the court, combined with an asymmetric optic of roughly 25 to 35 degrees, to control glare and keep light inside the cage. Our team angles the lights correctly on installation.

Do you provide lighting layout and electrical load requirements?

Yes. Each light position is shown on a court drawing. The electrical load requirement is 1,600 W per court. We recommend 3-phase power at the venue, both for welding during the roof build and for when all courts are lit at once. The main electrical connection must be done by an electrician.

What warranty applies to the structure, glass and turf?

A 3-year structural warranty covers production problems, which to date has never been an issue. Glass carries no warranty against breakage, as glass occasionally breaks at every padel club. We always include extra glass panels as backup and support you in fitting a replacement.

Do you provide spare parts?

Yes, free of charge: extra glass panels, extra washers for screws, extra plastic supports for the glass panels, and screws.

What is your delivery timeline to Thailand?

Production takes 4 weeks (custom colours are free of charge but usually add 2 weeks), loading the container 1 to 2 weeks, sea transport 10 to 14 days, and customs clearance and delivery 2 to 3 days. From confirmation to delivered courts is roughly 10 weeks. When we are also constructing the project, the court order is timed to land as close to completion of the roof and slab as possible.

What clubowners say

“

Professional, trustworthy, always available with helpful advice. We are very happy with Prism Padel and team for the seamless process of purchasing and installing our two padel courts for our exclusive estate in Bintan, Indonesia. The attention to detail, proficiency and flexibility are what set Prism Padel apart. They are always a phone call away when advice is required, from the original enquiry up until today, 12 months after installation.

Greg Williams
Greg Williams General Manager, The Sanchaya, Indonesia
“

It has been an absolute pleasure dealing with Prism Padel and Felix, from purchasing padel merchandise to padel courts. He does whatever it takes to attend to every detail to ensure the process is smooth with active updates. I have never met a more transparent person who puts the interest of his customer before all else, at times at his own expense.

Sebastian Kang
Sebastian Kang Co-Founder & Co-Owner, Singpadel
“

Working with Felix and his team was a seamless experience from start to finish. Their expertise and attention to detail in building our padel courts impressed us, as did their customer support. The team guided us through each step, from design and material selection to the final installation. Our facility stands out as a top destination for padel enthusiasts across N. Ireland and Ireland.

Andy Roberts
Andy Roberts Co-Founder & Co-Owner, Padel 54 Degrees North, N. Ireland
“

Choosing the right company to install our padel courts was one of the biggest decisions we made when developing Pikup Padel, and from day one Prism Padel proved we had made the right choice. Their knowledge, experience and honest advice were invaluable. The professionalism of everyone involved was outstanding, and the quality of the finished courts speaks for itself.

Derick Wilson Co-Founder & Co-Owner, Pikup Padel
“

Huge shout out to Prism Padel and Felix for supplying us with three beautiful courts. Super efficient to deal with, replies instantly even after works have been completed, and no issue was too big or small to solve. Highly recommend to anyone in the padel business or soon to be.

Shane Marshall
Shane Marshall Co-Founder & Co-Owner, The Cage Padel Tribe
“

Prism Padel has supported our club in more ways than one: club management, court maintenance, court supply and project management. We always highly recommend Prism Padel to anyone looking to open a padel club in Thailand and overseas. The track record speaks for itself.

Daniel Persson
Daniel Persson Founder & Owner, Padel Phuket @ Blue Tree, Thailand

Next step

Ready to build your padel club?

Tell us about your site and we will come back with a layout, a timeline and an itemised budget. Typical delivery from signed agreement to first serve is 8 to 12 weeks.

Chat with us